Archived

This topic is now archived and is closed to further replies.

vanamor

Change order of torrent list

Recommended Posts

I have just upped to 3.2 and suddenly the order in which torrent appear has changed from an alphabetical list to a numeric list based on the first numeral in the "Size" column. eg the first item is currently a file of 1.26GB, followed by one of 277MB, then 368MB, then 598MB, etc. Can I get 'em back to an alphabetic list?

EDIT Sorry, I have just realised I was wrong about the order of torrent list. It is an alphabetical list, with the Zs at the top and As at the bottom. Can I reverse this. (Coincidentally the numeric list I referred to was almost correct!)

Share this post


Link to post
Share on other sites